Resilient Flooring Installation Instructions
The needle should just touch the opposite side of.
Resilient flooring installation instructions. When installing over an existing resilient floor plan the layout so the new joints are a minimum of 6 152 cm away from the original seams. If needed add an additional layer of APA rated underlayment fasten and secure according to the underlayment manufacturers recommendations. 3mm Rustic Reclaimed Oak Click Resilient Vinyl.
The permanent HVAC system turned on and set to a minimum of 65F 20C or a maximum of 85F for a minimum of 7 days prior to during and after installation. Is for remedial action and relates to Division 07. Rinse clean and let dry.
Roll the adhered areas to within 6 of the seam line with a 100 lb three-section floor roller. 710 - Practice for Preparing Concrete and Other Monolithic Floors to Receive Resilient Flooring. To minimize shade variation mix and install planks from several cartons.
Resilient flooring needs time to acclimate in the room where it will be installed. An additional layer of APA rated 14 thick underlayment should be installed. When installing over tile floors joints should fall in the center of the tile.
Use only portland based patching and leveling compounds7 provide adequate means to protect face of doors door frames and walls from marring due to supply and installation of new resilient flooring andor removal of existing flooring. New concrete sub-floors should be allowed to cure a minimum of 30 days. Anyone installing Mannington products is urged to follow all directions and advice in the Installation Guidelines.
S EAMING INSTRUCTIONS IN A FULLSPREAD INSTALLATION-1. After adhesive is rolled on and completely dry position the flooring by over-lapping the seam edges. Vinyl Feature Strips and the resilient flooring material shall be thoroughly rolled in both directions with the roller as described in the resilient flooring manufacturers installation instructions.